Temporary fence at soundwall 3
|
Temporary fence at soundwall 3
|
Work to expose drainpipe at ramp
|
Work to expose drainpipe at ramp
|
Ironworkers unloading rebar at soundwall 2
|
Ironworkers unloading rebar at soundwall 2
|
Contractor excavation at angle point at station 23 and 60 at soundwall 2
|
Flooded excavation at station 23 and 25 at soundwall 2
|
Mertz workers spreading block and building scaffold at soundwall 3
|
More Mertz workers spreading block and building scaffold at soundwall 3
|
Vertical reinforcement with grade beam at soundwall 1
|
Close-up of vertical reinforcement of grade beam at soundwall 1
|
Close-up vertical reinforcement with concrete placed within grade beam at soundwall 1
|
Vertical reinforcement with concrete placed with grade beam at soundwall 1
|
Return wall footing at station 9, newly poured concrete at retaining wall 3
|
Setting of front face forms at station 10 at retaining wall 3
|
Setting front face forms at station 10 retaining wall 3
|
Retaining wall 3 back face forms are still in place, front face forms removed for pouring of concrete, contractor water curing/wetting front face of wall/burlap
|
Close-up of back fence of retaining wall 3 at station 10
|
Back fence of retaining wall 3 at station 10 |
Water cure method applied on front face of retaining wall 3 at station 10 with the use of burlap and watering frequently
|
Front face of retaining wall 3 at station 10
|
More of the front face of retaining wall 3
|
Exposed high-pressure gas line at station 20 at soundwall 2
|
Close-up of exposed high-pressure gas line at station 20 at soundwall 2
|
More exposed high-pressure gas line at station 20, soundwall 2
|
Exposed high-pressure gas line at station 20, soundwall 2
|
Flooded excavation at station 23 and 25 at soundwall 2
|
Flooded excavation at station 23 and 25 at soundwall 2
|
Pumping water out of flooded excavation at station 23 and 25 at soundwall 2
|
Concrete placement at retaining wall 3
|
Concrete placement of retaining wall 3
|