I-80/Greenback Lane-Elkhorn Blvd. Interchange Modification Project
Bearing pads, abutment 3, on compacted soil

Bearing pads, abutment 3, on compacted soil

Falsework, left bridge, left edge of deck

Falsework, left bridge, left edge of deck

Bearing pads, abutment 3, next to existing bridge

Bearing pads, abutment 3, next to existing bridge

Bearing pad, near abutment 3, sitting on AC

Bearing pad, near abutment 3, sitting on AC

Bearing pad, near abutment 3, sitting on AC (alternate view)

Bearing pad, near abutment 3, sitting on AC (alternate view)

Bearing pad, near abutment 3, sitting on AC, looking west

Bearing pad, near abutment 3, sitting on AC, looking west

Bearing pad, near abutment 3, sitting on AC, looking east

Bearing pad, near abutment 3, sitting on AC, looking east

Another view of bearing pad, looking west

Another view of bearing pad, looking west

Bearing pad looking west; note kickers

Bearing pad looking west; note kickers

Bearing pads on compacted soil, right of abutment 3

Bearing pads on compacted soil, right of abutment 3

Pre-stress trumpets in place at abutment 3

Pre-stress trumpets in place at abutment 3

Inside trumpets near existing bridge

Inside trumpets near existing bridge

Rebar being placed on left side of bridge

Rebar being placed on left side of bridge

Existing rebar, to be included in new bridge

Existing rebar, to be included in new bridge

Falsework, left side of bridge widening

Falsework, left side of bridge widening

Falsework, right side of bridge widening

Falsework, right side of bridge widening

Pre-stress ducts in place, right side widening

Pre-stress ducts in place, right side widening

Another look at the pre-stress ducts, right side widening

Another look at pre-stress ducts, right side widening

Rebar, right side widening

Rebar, right side widening

Pre-stress ducts in place, right widening

Pre-stress ducts in place, right widening

Top hat, right side widening

Top hat, right side widening

Closed Circuit Television conduit in place over pre-stress ducts

Closed Circuit Television conduit in place over pre-stress ducts

View of rebar at Bent 2

View of rebar at Bent 2

Another look at pre-stress ducts

Another look at pre-stress ducts

Existing rebar to be included in new bridge (right side)

Existing rebar to be included in new bridge (right side)...

Falsework in place for placement of stem and soffet concrete

Falsework in place for placement of stem and soffet concrete

Close up of falsework underneath sidewalk on right side

Close up of falsework underneath sidewalk on right side

Bent caps on asphalt concrete, right side widening

Bent caps on asphalt concrete, right side widening

View of bent caps, looking west

View of bent caps, looking west

Inside view of falsework bearing pads, looking west

Inside view of falsework bearing pads, looking west

Bearing pads and wedges inside bentwork

Bearing pads and wedges inside bentwork

Looking inside bentwork at bearing pads and wedges

Looking inside bentwork at bearing pads and wedges