Bearing pads, abutment 3, on compacted soil
|
Falsework, left bridge, left edge of deck
|
Bearing pads, abutment 3, next to existing bridge
|
Bearing pad, near abutment 3, sitting on AC
|
Bearing pad, near abutment 3, sitting on AC (alternate view)
|
Bearing pad, near abutment 3, sitting on AC, looking west
|
Bearing pad, near abutment 3, sitting on AC, looking east
|
Another view of bearing pad, looking west
|
Bearing pad looking west; note kickers
|
Bearing pads on compacted soil, right of abutment 3
|
Pre-stress trumpets in place at abutment 3
|
Inside trumpets near existing bridge
|
Rebar being placed on left side of bridge
|
Existing rebar, to be included in new bridge
|
Falsework, left side of bridge widening
|
Falsework, right side of bridge widening
|
Pre-stress ducts in place, right side widening
|
Another look at pre-stress ducts, right side widening
|
Rebar, right side widening
|
Pre-stress ducts in place, right widening
|
Top hat, right side widening
|
Closed Circuit Television conduit in place over pre-stress ducts
|
View of rebar at Bent 2
|
Another look at pre-stress ducts
|
Existing rebar to be included in new bridge (right side)...
|
Falsework in place for placement of stem and soffet concrete
|
Close up of falsework underneath sidewalk on right side
|
Bent caps on asphalt concrete, right side widening
|
View of bent caps, looking west
|
Inside view of falsework bearing pads, looking west
|
Bearing pads and wedges inside bentwork
|
Looking inside bentwork at bearing pads and wedges
|