Jump to Page Content
www.sacdot.com Where the Commitment to Excellence is Standard Practice County of Sacramento
Municipal Services Agency Back to SACDOT home County Home Services Help County Home
  Home   |   Documents   |   Services   |   Projects-Programs   |   About   |   Sitemap     
 
Project Links:

Project Home
Map
Timeline
Feedback
Contact
Archives







Pictures 1
Pictures 2
Pictures 3
Project Home
I-80/Greenback Lane-Elkhorn Blvd. Interchange Modification Project

The Sacramento County Department of Transportation is dedicated to providing a safe and efficient transportation system that achieves community mobility for citizens, businesses and industry within Sacramento County.

COMPLETED 2004!

The I-80/Greenback Lane-Elkhorn Boulevard Interchange Modification Project was a $9.5 million project designed to increase the traffic safety and efficiency of traffic flow, and aesthetically improve the appearance of the Greenback/Elkhorn corridor. The project included the following improvements:

I-80/Greenback Lane-Elkhorn Blvd. Image
  • widening of the existing I-80 Interchange to accommodate one additional through lane in each direction on Greenback Lane and Elkhorn Boulevard between Diablo Drive and Garfield Avenue;
  • widening of the I-80 on-and off-ramps, and installing meters on the on-ramps to accommodate High Occupancy Vehicle (HOV) lanes;
  • widening of the existing merge lanes in both the westbound and eastbound directions on I-80;
  • installation of sidewalks and bike lanes on both sides of Elkhorn Boulevard/Greenback Lane through the interchange;
  • construction of sound walls at adjacent residential properties to reduce traffic noise;
  • construction of a raised landscaped and/or stamped concrete median down the center of the roadway and;
  • placement of landscaping and architectural treatments throughout the project


Back to Top of Page
© 2010 County of Sacramento.
Privacy Policy Conditions of Use Accessibility Policy Alternative Formats